Place of Origin: | China |
Brand Name: | Yinchen |
Certification: | ISO SGS CE |
Model Number: | WNS |
Minimum Order Quantity: | 1 |
---|---|
Price: | usd 5000-89800 set |
Packaging Details: | 1.Package: Regular package or nut package; 2.Transportation: By land or by sea , it depends on the exporting areas. |
Delivery Time: | 1-20 working days |
Payment Terms: | L/C, T/T, MoneyGram |
Supply Ability: | 5000 set per year |
Steam Capacity: | 1-20 T/h | Steam Temperature: | 170/184/194/204 ℃ |
---|---|---|---|
Steam Pressure: | 0.7/1.0/1.25/1.6 Mpa | Fuel: | Light Oil, Heavy Oil, Diesel, Lpg, Waste Oil, Biogas, Natural Gas, Lng, City Gas |
Feed Water Temperature: | 20℃ Or 105℃ | Thermal Efficiency: | More Than 90% |
After-sale Service: | Engineer Available To Overseas Service | Product Name: | Propane Fired Steam Boiler For Textile Mill |
High Light: | oil fired condensing boilers,3 pass fire tube boiler |
Product introduction:
WNS series gas/oil fired steam boiler is horizontal three pass fire tube wet back full automatic steam boiler. It normally suitable for 500kg to 20ton/h capacity, use all kinds of gas and oil fuels,such as natural gas, LPG,LNG,CNG,city gas,town gas,biogas, diesel oil,heavy oil etc.
1. Model:WNS
2. Capacity:500kg/h-20ton/h
3. Design pressure:1.0Mpa(10bar), 1.25Mpa(13bar), 1.6Mpa(16bar),2.5Mpa(25bar)
4. Stem temperature:below 224 degree
5. Design fuel:natural gas, lpg,lng,cng,city gas,biogas, diesel oil,heavy oil
6. Structure: three pass fire tube wet back
7. Application: boiler for textile mill, milk pasteurization,corrugated machine, sugar factory,printing dyeing mill,medicine industry, food & beverage industry, chemical industry, garment industry, food processing industry, and wood processing industry, etc.
Boiler Model |
Rated Capacity | Rated Pressure | Steam Temperature |
Fuel consumption |
Thermal efficiency | Weight | |
t/h | Mpa | ℃ |
Diesel oil (Kg/h) |
Natural gas (Nm³/h) |
% | T | |
WNS0.5-1.0-Y(Q) | 0.5 | 1 | 184 | 20-35 | 18-35 | >90 | 3 |
WNS1-1.0-Y(Q) | 1 | 1 | 184 | 45-100 | 70-100 | >90.2 | 4.3 |
WNS2-1.25-Y(Q) | 2 | 1.25 | 194 | 120-140 | 140-150 | >91.5 | 7.2 |
WNS3-1.25-Y(Q) | 3 | 1.25 | 194 | 180-210 | 185-230 | >91.6 | 8 |
WNS4-1.25-Y(Q) | 4 | 1.25 | 194 | 230-280 | 240-290 | >91.7 | 9.6 |
WNS6-1.25-Y(Q) | 6 | 1.25 | 194 | 360-380 | 370-400 | >92 | 16.5 |
WNS8-1.25-Y(Q) | 8 | 1.25 | 194 | 470-510 | 480-530 | >91.3 | 24.8 |
WNS10-1.25-Y(Q) | 10 | 1.25 | 194 | 600-630 | 650-700 | >92.4 | 26.8 |
WNS15-1.25-Y(Q) | 15 | 1.25 | 194 | 900-940 | 930-1000 | >92.5 | 38 |
WNS20-1.25-Y(Q) | 20 | 1.25 | 194 | 1200-1300 | 1350-1500 | >93 | 55 |
(1). Strength calculation report with applied materials information;
(2). 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3). 100% X-ray inspection(welding seam): ensure the quality of entire boiler;
(4). Hydrostatic test ensure the standard working pressure and safety;
(5). Third-party inspection report:By Henan Boiler Inspection Institute;
(6). Passed ISO:9001 SGS and CE certificate.
1.When transport, the boiler body and large auxiliary equipments (platform, chimney, economizer, etc ) are nude packed or tied up.
2.the smaller auxiliary equipments are encased by using the strong intensity wooden or plywood box.
3.The products could be transported by ship and train, customers could designate the ports.
4.If necessary, the small auxiliaries could be transported by airplane.
Q- What is your payment term ?
A-Usually it would be 30% deposit payment, 70% balance before delivery. T/T, L/C and other way.
Q- Are your company is a trading company or a factory?
A-We are a 20 years old industrial boiler factory, specializing in OIL and GAS and Coal fired steam boiler.
Q- What is the warranty for boilers?
A-Our company promises all the accessories can be changed for new ones because of quality problems within 3 years, and the boiler host has Lifetime Warranty.
Q- Can we get installation and commissioning service ?
A-Yes, our engineers are available for your need, but the relative cost needs to be paid.
Q- What about the delivery ?
A-Usually it will take about 35-45 days for pressured boilers, and 25-30 days for non-pressured boilers. Double confirmation shall be necessary before ordering.
Q- Where is your company or your factory?
A-Our factory is located in Taikang County Industry Cluster, Henan Province, China.
Q- What’s your MOQ?
A-Only 1 set, if you have more than that, you will get a more favorable price.
Q- Can we visit your factory ?
A-Yes, welcome for your coming at any time. If you need, we can pick you up when you get to our province.
Contact Person: info