Place of Origin: | HENAN |
Brand Name: | Yinchen |
Certification: | ISO SGS CE |
Model Number: | WNS |
Minimum Order Quantity: | 1 |
---|---|
Price: | 5000-79800 USD |
Packaging Details: | Boiler body covered with water-proof covering, accessories in plywood case or iron box. |
Delivery Time: | 1-20 working days |
Payment Terms: | L/C, T/T, MoneyGram |
Supply Ability: | 5000 set per year |
Item Name: | Industrial Steam Boiler For Pharmaceutical Industry | Capacity Range: | 0.5--20 Ton |
---|---|---|---|
Pressure Range: | 0.7-2.5 Mpa | Temperature Range: | 170-204 ℃ |
Design Fuel: | Light Oil, Heavy Oil, Diesel, Lpg, Waste Oil, Biogas, Natural Gas, Lng, City Gas | Feed Water Temperature: | 20℃ |
Boiler Water Capacity: | 1.8-30 M3 | Colour: | As Per Customer's Requirement |
High Light: | oil fired condensing boilers,3 pass fire tube boiler |
WNS series gas/oil fired steam boiler is horizontal three pass fire tube wet back full automatic steam boiler. It normally suitable for 500kg to 20ton/h capacity, use all kinds of gas and oil fuels,such as natural gas, LPG,LNG,CNG,city gas,town gas,biogas, diesel oil,heavy oil etc.
1. Model:WNS
2. Capacity:500kg/h-20ton/h
3. Design pressure:1.0Mpa(10bar), 1.25Mpa(13bar), 1.6Mpa(16bar),2.5Mpa(25bar)
4. Stem temperature:below 224 degree
5. Design fuel:natural gas, lpg,lng,cng,city gas,biogas, diesel oil,heavy oil
6. Structure: three pass fire tube wet back
7. Application: boiler for textile mill, milk pasteurization,corrugated machine, sugar factory,printing dyeing mill,medicine industry, food & beverage industry, chemical industry, garment industry, food processing industry, and wood processing industry, etc.
Type |
WNS0.5-1.0-Y(Q) |
WNS1-1.0-Y(Q) |
WNS2-1.0-Y(Q) |
WNS3-1.25-Y(Q) |
WNS4-1.25-Y(Q) |
WNS5-1.25-Y(Q) |
WNS6-1.25-Y(Q) |
WNS8-1.25-Y(Q) |
WNS10-1.25-Y(Q) |
WNS10-1.6-Y(Q) |
SZS20-2.5-450 Y(Q) |
||
Rated Output |
0.5 |
1 |
2 |
3 |
4 |
5 |
6 |
8 |
10 |
10 |
20 |
||
Rated Steam Pressure |
1.0 |
1.0 |
1.25 |
1.25 |
1.25 |
1.25 |
1.25 |
1.25 |
1.25 |
1.6 |
2.5 |
||
Steam Temperature |
184 |
184 |
194 |
194 |
194 |
194 |
198 |
194 |
194 |
204 |
450 |
||
Thermal Efficiency |
92.2 |
92.4 |
92.5 |
92.5 |
92.8 |
92.8 |
93.2 |
93.5 |
93.8 |
94.2 |
94.5 |
||
Rated Oil/Gas Consumption |
30.5 38 |
61 76 |
122 151 |
185 230 |
243 300 |
306 379 |
362 400 |
485 598 |
610 755 |
611 756 |
1221 1510 |
||
Power Consumption |
2.96 |
4.4/8.9 |
7/20.2 |
9.5/22.7 |
13/26.2 |
14.5/28 |
23/45.4 |
24/37.5 |
39.5/52 |
39.5/52 |
58/65 |
||
Suitable Fuel |
Light/ Heavy oil, Natural gas/ Town gas, Coke oven gas |
||||||||||||
Power Supply(AC) |
380V 50Hz |
||||||||||||
Maximum Shipping Size |
3.1 ×1.9 ×1.9 |
4.35 ×2.5 ×2.33 |
4.17 ×2.1 ×2.96 |
4.48 ×2.38 ×2.96 |
4.9 ×2.9 ×3.1 |
5.3 ×2.4 ×3.27 |
6.14 ×2.4 ×3.27 |
6.01 ×2.9 ×3.37 |
6.86 ×2.9 ×3.27 |
6.86 ×2.9 ×3.37 |
10.8 ×3.1 ×3.6 |
||
Type of Burning |
Pressure Atomization/ Pressurized Combustion |
||||||||||||
Adjustment Methods |
Automatic |
(1). Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection(welding seam): ensure the quality of entire boiler;
(4). Hydrostatic test ensure the standard working pressure and safety;
(5). Third-party inspection report:By Henan Boiler Inspection Institute;
(6). Passed ISO:9001,SGS and CE certificate.
Packaging |
1.When transport, the boiler body and large auxiliary equipments (platform, chimney, economizer, etc ) are nude packed or tied up. |
Transportation |
3.The products could be transported by ship and train, customers could designate the ports. |
FAQ
Q- What is your payment term ?
A- Usually it would be 30% deposit payment, 70% balance before delivery. T/T, L/C and other way.
Q- Are your company is a trading company or a factory?
A- We are a 20 years old industrial boiler factory, specializing in OIL and GAS and Coal fired steam boiler.
Q- What is the warranty for boilers?
A- Our company promises all the accessories can be changed for new ones because of quality problems within 3 years, and the boiler host has Lifetime Warranty.
Q- Can we get installation and commissioning service ?
A-Y es, our engineers are available for your need, but the relative cost needs to be paid.
Q- What about the delivery ?
A-Usually it will take about 35-45 days for pressured boilers, and 25-30 days for non-pressured boilers. Double confirmation shall be necessary before ordering.
Contact Person: info