Place of Origin: | HENAN |
Brand Name: | Yinchen |
Certification: | ISO SGS CE |
Model Number: | DZH/DZL |
Minimum Order Quantity: | 1 |
---|---|
Price: | usd 5000-59800 set |
Packaging Details: | 1.Package: Regular package or nut package; 2.Transportation: By land or by sea , it depends on the exporting areas. |
Delivery Time: | 1-20 working days |
Payment Terms: | L/C, T/T, MoneyGram |
Supply Ability: | 5000 set month |
Gate Type: | Moving Grate | Rated Output: | 1-4 T/h |
---|---|---|---|
Structure: | Water And Fire Tube | Thermal Efficiency: | 80.33%-81.44% |
Design Fuel: | Coal Or Other Biomass Fuel | Design Pressure: | 0.7 - 1.25 Mpa |
Steam Temperature: | 170- 194 ℃ | Boiler Type: | Hand Fired Boiler |
High Light: | coal fired residential boiler,chain grate coal fired steam boiler |
Apply Fuel: coal, wood/wood pellets, biomass, rice husk pellets, straw pellets and so on. |
Payment Terms: 30% T/T in advance ,70% before factory delivery. |
Lead Time: About 10-15 days after received the down payment. |
Boiler Application:
1. Chemical industry, plastics industry, coatings and automotive industry, leaching industry,
2. Construction equipment industry, shipbuilding industry.
3. Garment making, washing and ironing,
4. Pharmaceutical industry, biological engineering, food industry.
5. Sauna cosmetology, hotel hotel, physical fitness, school.
6. Scientific experiment.
Boiler Feature:
♦ Spirally corrugated tube
Function: (1) Heat transfer enhancement; (2) Improve the suppleness to avoid the tube plate cracking; (3) Clean groove itself.
♦ Arched tube plate
reduce the thermal stress of weld; improve the tube plate suppleness; simplify the structure and save the boiler room space.
♦ Complete protection device
Function: deal with the situation of over pressure, over-temperature, water shortage and flame out.
♦ Up-tube layout
Function: (1) Avoid the bulging on boiler drum; (2) Promote the water cycle (3)clean the sediment in the boiler bottom.
♦ Airfoil flue
Function: Lower the high temperature of tube plate flue gas. And then reduce the thermal load of the boiler bottom.
♦ The return water injector
Function: Increase the reliability of the water circulation and avoid the booster caused by the poor circulation.
Boiler Technicals
DZH Series New-type Fire and Water Tube Steam Boiler | ||||||
Type | Rated Evaporation (t/h) |
Rated Steam Pressure (Mpa) |
Steam Temperature (℃) |
Heating Area (M³) |
Grate Area (M³) |
Size L×W×H (m) |
DZH1-0.7- AII | 1 | 0.7 | 170 | 36.5 | 1.9 | 3.9×1.85×3.12 |
DZH1-1.0- AII | 1 | 1.0 | 184 | 39.4 | 1.9 | 3.9×1.85×3.12 |
DZH2-0.7- AII | 2 | 0.7 | 171 | 53.6 | 3.74 | 4.5×2.24×3.32 |
DZH2-1.25- AII | 2 | 1.25 | 194 | 73.6 | 3.74 | 4.5×2.24×3.32 |
DZH4-1.25- AII | 4 | 1.25 | 194 | 146.03 | 3.93 |
5.3×2.44×3.6 |
Henan Yinchen Boiler Group Co.,LTD. was founded at the beginning of 2001, which has a registered captical of 51.66 million. Its headquarters is in the industrial district in Fucaolou town, Taikang county of Henan province. The production factory is adjacent to Yong Deng high-speed,and the 311 national road is also through this district,so it has very convenient transportation conditions.Besides, it is one of the key leading enterprises which firstly get the National Boiler Manufacturing license. With the manufacturing license qualification of "B" class boiler and "D2"class pressure vessel, it is director of China Industrial Boiler Association, member unit of China Welding Association and the enterprise of emphasizing the contract and credit in Henan province. The products have already passed ISO9001-2000 international quality system certification.
Our service
Consultation service: Experienced technicians guidance is available on the phone, and on the internet.
Installation service:One or more engineers will be dispatched to the installation site to help install the customers' boilers.
Training service: We also provide necessary training about boiler operation and daily maintenance to local workers.
Warm service: Based on customers' request and budget, our experts make efficient, reliable solutions, and we produce strictly following customers' order. Every customer has the chance to visit our workshops before placing the order.
Identify the type of boiler you want(steam boiler or hot water boiler).
The boiler capacity,pressure,and fuel(oil,gas,biomass,coal),or you can consult us.
Guide installation online or we can provide staff installation by our staffs, but you have to afford the extra cost if If we send professional staff overseas to install it.
Generally, it will take 10 to 15 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
We will supply professional after-sale service team as soon as we receiving your problem feedback, we will dispatch our engineers to your country and solve your problems right now.
Contact Person: info