Place of Origin: | HENAN |
Brand Name: | Yinchen |
Certification: | ISO SGS CE |
Model Number: | WNS |
Minimum Order Quantity: | 1 |
---|---|
Price: | 4000-79800 USD |
Packaging Details: | Boiler body covered with water-proof covering, accessories in plywood case or iron box. |
Delivery Time: | 1-20 working days |
Payment Terms: | L/C, T/T, MoneyGram |
Supply Ability: | 5000 set per year |
Product Name: | Diesel Fired Steam Boiler | Steam Capacity: | 0.5-20 Ton |
---|---|---|---|
Pressure: | Low Pressure | Temperature Range: | 170-204 ℃ |
Sutable Fuel: | Light Oil, Heavy Oil, Diesel, Lpg, Waste Oil, Biogas, Natural Gas, Lng, City Gas | Boiler Material: | Q245R Boiler Special Steel Plate |
Voltage: | 380V-420V | Frequency: | 50-60Hz |
Warranty: | One Year | ||
High Light: | oil powered boiler,diesel fired hot water boiler |
Product introduction:
The boiler belongs to the furnace-down type internal combustion three-return wet-back type shell quick-loading boiler.
The burner adopts the Italian Baltur imported burner, and the automatic control system is professionally manufactured by Nanjing Rentai Faen Electric Co., Ltd. Suitable for burning natural gas, liquefied gas, light oil and new alcohol-based fuels.
The diameter of the cylinder is large, the steam space is correspondingly large, and the steam quality is good and the load adaptability is strong.
The furnace adopts a high-efficiency, heat-strengthened threaded pipe; the three-pass design, long flue gas flow, low exhaust gas temperature and high thermal efficiency.
The fuel is ignited in the fire channel in front of the corrugated furnace. The high-temperature flue gas after combustion is diverted from the furnace to the flue pipe bundle and the front smoke box, and then passed through the pipe bundle into the rear smoke box and the chimney. atmosphere.
The boiler has the characteristics of simple manufacture, low steel consumption, small volume, high thermal efficiency, low pollution, low noise, convenient installation and high operation management efficiency.
Boiler Model |
Rated Capacity | Rated Pressure | Steam Temperature |
Fuel consumption |
Thermal efficiency | Weight | |
t/h | Mpa | ℃ |
Diesel oil (Kg/h) |
Natural gas (Nm³/h) |
% | T | |
WNS0.5-1.0-Y(Q) | 0.5 | 1 | 184 | 20-35 | 18-35 | >90 | 3 |
WNS1-1.0-Y(Q) | 1 | 1 | 184 | 45-100 | 70-100 | >90.2 | 4.3 |
WNS2-1.25-Y(Q) | 2 | 1.25 | 194 | 120-140 | 140-150 | >91.5 | 7.2 |
WNS3-1.25-Y(Q) | 3 | 1.25 | 194 | 180-210 | 185-230 | >91.6 | 8 |
WNS4-1.25-Y(Q) | 4 | 1.25 | 194 | 230-280 | 240-290 | >91.7 | 9.6 |
WNS6-1.25-Y(Q) | 6 | 1.25 | 194 | 360-380 | 370-400 | >92 | 16.5 |
WNS8-1.25-Y(Q) | 8 | 1.25 | 194 | 470-510 | 480-530 | >91.3 | 24.8 |
WNS10-1.25-Y(Q) | 10 | 1.25 | 194 | 600-630 | 650-700 | >92.4 | 26.8 |
WNS15-1.25-Y(Q) | 15 | 1.25 | 194 | 900-940 | 930-1000 | >92.5 | 38 |
WNS20-1.25-Y(Q) | 20 | 1.25 | 194 | 1200-1300 | 1350-1500 | >93 | 55 |
(1).Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection(welding seam): ensure the quality of entire boiler;
(4).Hydrostatic test ensure the standard working pressure and safety;
(5).Third-party inspection report:By Henan Boiler Inspection Institute;
(6).Passed ISO:9001,SGS and CE certificate.
Packaging |
1.When transport, the boiler body and large auxiliary equipments (platform, chimney, economizer, etc ) are nude packed or tied up. |
Transportation |
3.The products could be transported by ship and train, customers could designate the ports. |
FAQ
Q-What is your payment term ?
A-Usually it would be 30% deposit payment, 70% balance before delivery. T/T, L/C and other way.
Q-Are your company is a trading company or a factory?
A-We are a 20 years old industrial boiler factory, specializing in OIL and GAS and Coal fired steam boiler.
Q-What is the warranty for boilers?
A-Our company promises all the accessories can be changed for new ones because of quality problems within 3 years, and the boiler host has Lifetime Warranty.
Q-Can we get installation and commissioning service ?
A-Yes, our engineers are available for your need, but the relative cost needs to be paid.
Q-What about the delivery ?
A-Usually it will take about 35-45 days for pressured boilers, and 25-30 days for non-pressured boilers. Double confirmation shall be necessary before ordering.
Product Usage:
WNS series oil steam boiler adopts three returns wet back structure, taking gas as fuel and transferring the chemical energy to heat energy, is widely used in garment factory, textile factory, brick making plant, food processing plant, beer processing, rice milling field, chemical plant, pharmaceutical factory, etc.
Contact Person: info