Place of Origin: | China |
Brand Name: | Yinchen |
Certification: | ISO SGS CE GB |
Model Number: | DZL |
Minimum Order Quantity: | 1 |
---|---|
Price: | usd 5000-98000 set |
Packaging Details: | 1.Package: Regular package or naked package; 2.Transportation: By land or by sea , it depends on the exporting areas. |
Delivery Time: | 1-20 working days |
Payment Terms: | L/C, T/T, MoneyGram |
Supply Ability: | 5000 set per year |
Name: | Chain Grate Coal Boiler / Biomass Boilers/ Wood Boilers | Rated Steam Capacity: | 1t/h--20t/h |
---|---|---|---|
Rated Pressure: | 1.25 Mpa | Rated Steam Temperature: | 194 ℃ |
Design Fuel: | Coal,Biomass Etc | Colour: | Customized |
Weight: | Depends On Model | Size: | Depends On Model |
High Light: | horizontal fire tube boiler,steam boiler machine |
Product information
1. Model:DZL |
2. Capacity:1-20ton/h |
3. Design pressure:1.0Mpa(10bar), 1.25Mpa(13bar), 1.6Mpa(16bar),2.5Mpa(25bar) |
4. Stem temperature:184C,194C,204C,224C |
5. Design fuel:coal,biomass,wood,rice husk,coconut shell,Palm shell etc |
6. Structure: three pass structure with water and fire tube |
7. Application: textile plant, milk pasteurization,corrugated machine, sugar factory,printing dyeing mill,medicine industry, food & beverage industry, chemical industry, garment industry, food processing industry, and wood processing industry, etc. |
Product feature
1. By pulling the partial ascension pipe on both sides of the heads into the furnace, and then lead into drum side’s bottom and supplementing with the bottom of the drum to form the roof heating surface, the new furnace structure has successfully solved the bottom of the drum directly by the high temperature flame radiation, to avoid the "drum package" defects.
2. Two wings smoke flue’s design,tom make the smoke flow into front smoke box smoothly and the same tube temperature as before to avoid the temperature stress and produce tube plate cracks.
3. The drum with a single return thread pipe, to strengthen the heat transfer effect, while the threaded pipe with self-cleaning function, to avoid the ash deposits inside the pipe.
4. Boiler front and back arch adopt support the water wall tube as support ‘s overall casting structure, then the formation of permanent arch. The back arch is low and long, the exit section is anti-tilt, the front arch angle 45 °,match the back arch, forming a clear inverted "α" flame, which is conducive to low-grade coal combustion and has good coal adaptability .
5. Grate lateral sealing structure design is advanced and reasonable, avoiding the lateral sealing card grate and the grate both sides uneven wind to cause the defects of burning out the side seal. 4t / h and less then 4t boiler adopts side seal cold angle iron plate structure, above 6t / h boiler adopts contact-type lateral sealing structure.
6. Under the grate have the independent adjustment wind chamber, from both sides inlet air; Using new crank arm screw adjusting structure, so that the air ventilation section ratio reaches 100%, flexible adjustment, ventilation uniform.Push-pull type gate segment soot cleaning device, gate segment adopts heat-resisting cast iron with seal structure, thus effectively preventing secondary combustion deformation and grate air leakage.
Product technicals
Type | Rated Capacity | Rated Steam Pressure | Feed Water Temperature | Steam Temperature |
Grate Area |
Exhaust gas temperature |
Thermal Efficiency |
Maximum size |
DZL1-1.0-AII | 1 | 1 | 20 | 184 | 1.9 | 157.3 | 80.33 | 5488×2000×2832 |
DZL2-1.6- AII | 2 | 1.6 | 20 | 205 | 3.4 | 163.1 | 80.54 | 5694×2550×3364 |
DZL4-1.6- AII | 4 | 1.6 | 20 | 205 | 5.18 | 169 | 80.28 | 6470×2820×3668 |
DZL6-1.6- AII | 6 | 1.6 | 20 | 205 | 7.55 | 166.3 | 80.94 | 8244×2951×3550 |
DZL10-1.6- AII | 10 | 1.6 | 105 | 205 | 12 | 151.2 | 80.91 | 7700×3200×3500 |
DZL15-1.6- AII | 15 | 1.6 | 105 | 205 | 18 | 161.6 | 81.5 | 7650×3350×3500 |
DZL20-1.6- AII | 20 | 1.6 | 105 | 206 | 22.85 | 150.6 | 81.44 | 7665×3800×3565 |
Why do you choose us?
(1) Strength calculation report with applied materials information;
(2) 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3) 100% X-ray inspection(welding seam): ensure the quality of entire boiler;
(4) Hydrostatic test ensure the standard working pressure and safety;
(5) Third-party inspection report:By Henan Boiler Inspection Institute;
(6) Passed ISO:9001 and SGS certificate.
Packing and shipping
1. When transport, the boiler body and large auxiliary equipments (platform, chimney, economizer, etc ) are nude packed or tied up.
2. the smaller auxiliary equipments are encased by using the strong intensity wooden or plywood box.
3. The products could be transported by ship and train, customers could designate the ports.
4. If necessary, the small auxiliaries could be transported by air.
Our service
Consultation service: Experienced technicians guidance is available on the phone, and on the internet.
Installation service:One or more engineers will be dispatched to the installation site to help install the customers' boilers.
Training service: We also provide necessary training about boiler operation and daily maintenance to local workers.
Warm service: Based on customers' request and budget, our experts make efficient, reliable solutions, and we produce strictly following customers' order. Every customer has the chance to visit our workshops before placing the order.
Contact Person: info