Place of Origin: | HENAN |
Brand Name: | Yinchen |
Certification: | ISO SGS CE |
Model Number: | WNS |
Minimum Order Quantity: | 1 |
---|---|
Price: | 4000-79800 USD |
Packaging Details: | Boiler body covered with water-proof covering, accessories in plywood case or iron box. |
Delivery Time: | 1-20 working days |
Payment Terms: | L/C, T/T, MoneyGram |
Supply Ability: | 5000 set per year |
Product Name: | Oil Steam Boiler Machine | Steam Capacity: | 0.5--20 Ton |
---|---|---|---|
Thermal Efficiency: | More Than 92% | Temperature Range: | 170-204 ℃ |
Sutable Fuel: | Light Oil, Heavy Oil, Diesel, Lpg, Waste Oil, Biogas, Natural Gas, Lng, City Gas | Boiler Material: | Q245R Boiler Special Steel Plate |
Voltage: | 380V-420V | Boiler Size: | Depends On Model |
Service: | Engineer Available Overseas Service | ||
High Light: | oil powered boiler,low pressure hot water boiler |
Product introduction:
WNS series gas/oil fired steam boiler is horizontal three pass fire tube wet back full automatic steam boiler. It normally suitable for 500kg to 20ton/h capacity, use all kinds of gas and oil fuels,such as natural gas, LPG,LNG,CNG,city gas,town gas,biogas, diesel oil,heavy oil etc.
1. Model:WNS
2. Capacity:500kg/h-20ton/h
3. Design pressure:1.0Mpa(10bar), 1.25Mpa(13bar), 1.6Mpa(16bar),2.5Mpa(25bar)
4. Stem temperature:below 224 degree
5. Design fuel:natural gas, lpg,lng,cng,city gas,biogas, diesel oil,heavy oil
6. Structure: three pass fire tube wet back
7. Application: boiler for textile mill, milk pasteurization,corrugated machine, sugar factory,printing dyeing mill,medicine industry, food & beverage industry, chemical industry, garment industry, food processing industry, and wood processing industry, etc.
Boiler Model |
Rated Capacity | Rated Pressure | Steam Temperature |
Fuel consumption |
Thermal efficiency | Weight | |
t/h | Mpa | ℃ |
Diesel oil (Kg/h) |
Natural gas (Nm³/h) |
% | T | |
WNS0.5-1.0-Y(Q) | 0.5 | 1 | 184 | 20-35 | 18-35 | >90 | 3 |
WNS1-1.0-Y(Q) | 1 | 1 | 184 | 45-100 | 70-100 | >90.2 | 4.3 |
WNS2-1.25-Y(Q) | 2 | 1.25 | 194 | 120-140 | 140-150 | >91.5 | 7.2 |
WNS3-1.25-Y(Q) | 3 | 1.25 | 194 | 180-210 | 185-230 | >91.6 | 8 |
WNS4-1.25-Y(Q) | 4 | 1.25 | 194 | 230-280 | 240-290 | >91.7 | 9.6 |
WNS6-1.25-Y(Q) | 6 | 1.25 | 194 | 360-380 | 370-400 | >92 | 16.5 |
WNS8-1.25-Y(Q) | 8 | 1.25 | 194 | 470-510 | 480-530 | >91.3 | 24.8 |
WNS10-1.25-Y(Q) | 10 | 1.25 | 194 | 600-630 | 650-700 | >92.4 | 26.8 |
WNS15-1.25-Y(Q) | 15 | 1.25 | 194 | 900-940 | 930-1000 | >92.5 | 38 |
WNS20-1.25-Y(Q) | 20 | 1.25 | 194 | 1200-1300 | 1350-1500 | >93 | 55 |
1. Lower dust emission & SO2 emission & NOx emission, dust emission concentration < 30mg/m³,SO2 & NOx emission concentration < 30mg/m³.
2. We have strict quality control system. From the material, welding, to finished boiler shipment, from project , establishment, drawing design, to final audit.
3. Each boiler system part is from first class brand all over the world or China, ensure the high quality.
4. We can offer the best after sales services and send our engineer to your factory to give you the complete installation and commission guidance.
Packaging |
1.When transport, the boiler body and large auxiliary equipments (platform, chimney, economizer, etc ) are nude packed or tied up. |
Transportation |
3.The products could be transported by ship and train, customers could designate the ports. |
FAQ
Q-What is your payment term ?
A-Usually it would be 30% deposit payment, 70% balance before delivery. T/T, L/C and other way.
Q-Are your company is a trading company or a factory?
A-We are a 20 years old industrial boiler factory, specializing in OIL and GAS and Coal fired steam boiler.
Q-What is the warranty for boilers?
A-Our company promises all the accessories can be changed for new ones because of quality problems within 3 years, and the boiler host has Lifetime Warranty.
Q-Can we get installation and commissioning service ?
A-Yes, our engineers are available for your need, but the relative cost needs to be paid.
Q-What about the delivery ?
A-Usually it will take about 35-45 days for pressured boilers, and 25-30 days for non-pressured boilers. Double confirmation shall be necessary before ordering.
Contact Person: info